Heavy Civil Construction
in South Florida
Over 18 years and 540+ South Florida projects delivered. Bedrock self-performs concrete, demolition, excavation and underground utilities — on time, on budget, every time.

Integrated civil construction.
Engineered to outlast hurricanes, deadlines, and the next generation.
- Concrete & FoundationsHVHZ-rated slabs, footings, tilt-up.
- DemolitionSelective interior to full structural.
- Excavation & EarthworkSite prep, grading, dewatering.
- Underground UtilitiesStormwater, sanitary, water main.
SR-9 / Palmetto
Interchange Rebuild.

Five elevated ramps, 38,000 cubic yards of structural concrete, and live traffic maintained on a 24/7 corridor. Delivered six weeks ahead of FDOT contract date.
Four markets.
One standard.

Heavy Civil & DOT
Bridges, interchanges, drainage, FDOT-spec roadwork across South Florida corridors.

Vertical & Mixed-Use
Tilt-up, structured parking, podium decks, HVHZ-rated foundations for Class A builds.

Selective & Structural
Surgical interior strip-outs to full structural tear-downs, recycled and documented.

Estate & Custom Homes
Architect-grade slabs, pool decks, stamped driveways for South Florida's finest residences.
Numbers we don't round up.

The crew is the company.
Every Bedrock foreman holds OSHA 30. Every project starts with a job hazard analysis. Our crews live in the same communities they build, and that's the standard we hold.
Twelve disciplines.
Self-performed.
Insight from the people doing the work.

Why HVHZ slabs cost more — and last decades longer.
What Miami-Dade's wind code actually demands of a foundation, in plain English.

Rebuilding Florida's coastal corridors after a Cat-4.
Inside the rapid-mobilization playbook that gets traffic moving in 14 days.

From rod-buster to project manager: a Bedrock career.
How we promote 80% of project leads from the field — and what it means for clients.
Quote to keys, in four moves.
Free Quote
Submit your scope online or call. We respond within 24 hours.
Site Walk
Crew chief visits, takes measurements, confirms scope.
Mobilize
Permits pulled, equipment staged, work begins on schedule.
Hand-Off
Cleanup, walkthrough, final invoice. No surprises.

Florida-built crews.
Year-round work.
Concrete finishers, equipment operators, foremen, project managers — paid weekly, health and dental from day 31, and 80% of leadership promoted from the field.
Miami-Dade, Broward & Palm Beach.
South Florida, end to end.
Answers, before you ask.
Straight talk from estimators and project managers who've delivered 1,400+ South Florida builds.
How fast can Bedrock mobilize on a South Florida project?
+
Most projects mobilize within 5–10 business days of contract signing. Emergency response (storm cleanup, structural demo) can deploy within 24–48 hours across Miami-Dade, Broward, and Palm Beach counties.
Are you licensed and insured to work in HVHZ zones?
+
Yes. Bedrock is fully licensed, bonded, and insured in the State of Florida and certified for High-Velocity Hurricane Zone (HVHZ) work in Miami-Dade and Broward. We carry $5M general liability and full workers' comp.
Do you self-perform or subcontract?
+
We self-perform concrete, demolition, excavation, and underground utilities with 120+ tradespeople on payroll. Self-performing means tighter schedules, lower cost, and one accountable team — not a paper-only GC.
What's the typical turnaround on a free quote?
+
24 hours for residential and small commercial. 3–5 business days for full heavy-civil and DOT proposals. Submit scope online or call (786) 730-8367.
Are you FDOT pre-qualified for state roadwork?
+
Yes — Bedrock is FDOT pre-qualified for drainage, structures, and grading work in District 6 and District 4, with a track record of 28+ DOT-spec projects delivered on schedule.
